Farm · account sizing
Min start · basics first
Always start with the smallest contract: micro / mini (E-mini) where they exist, then step up. Instrument-specific minimums — not flat $10k. Farm day-margin estimates, not live broker quotes.
Card format:
If MM / Risk needs more:
When a micro exists: prefer that as the basics start (e.g. GC →
Start $X (min 1-lot) · com = 2.40If MM / Risk needs more:
Start $X · needs $Y for this size · com = 2.40When a micro exists: prefer that as the basics start (e.g. GC →
MGC $500).
17_ MGC 102 trades Ave26 Curve good · Start $500 (min 1-lot) · com = 2.40
loading…
Start here · basics
| Symbol | Label | Size | Min start | Basics path | Unit | Tier |
|---|---|---|---|---|---|---|
| Fetching table… | ||||||